Project Scope
This case covers a Schneider Electric solution for Overseas. The contracted scope centers on Main LV PC, with delivery readiness targeted for 2024. Kodery coordinated primary scheme review, panel manufacturing and on-site interface checks so the lineup could enter service with clear feeder logic and documented settings.
Main PC lineup with ACB incoming, bus-tie and feeder drawers using Schneider Electric components for a mixed commercial load profile.
Technical Configuration
The technical package is built around Schneider Electric MV/LV switchgear, MCCB/ACB devices and matched power-center cabinets. Typical work items include:
- Primary scheme confirmation for incoming, bus-tie and outgoing sections
- Protection and metering layout aligned with the site single-line diagram
- Enclosure, busbar and cable interface preparation for installation
- Factory assembly, wiring check and functional interlocking verification
Delivery & Commissioning
Engineering and project teams followed Schneider Electric architecture selection, busbar sizing and interlocking logic. After manufacturing, the cabinets were inspected, packed and shipped according to project logistics. Site support covered positioning guidance, secondary connection review and energization assistance where required by the contract.
Project Value
The completed package helps the end user operate a clearer distribution room layout, reduce interface risk between cabinets and field cables, and keep spare-part / brand consistency for later expansion. Project reference: Schneider Electric Main Incoming Power Center (Overseas · Main LV PC · COD 2024).