Project Scope
This case covers a Schneider Electric solution for Asia. The contracted scope centers on MV + LV Set, with delivery readiness targeted for 2025. Kodery coordinated primary scheme review, panel manufacturing and on-site interface checks so the lineup could enter service with clear feeder logic and documented settings.
Matched Schneider Electric distribution room set covering upstream protection and downstream withdrawable feeders for a single-room layout.
Technical Configuration
The technical package is built around Schneider Electric MV/LV switchgear, MCCB/ACB devices and matched power-center cabinets. Typical work items include:
- Primary scheme confirmation for incoming, bus-tie and outgoing sections
- Protection and metering layout aligned with the site single-line diagram
- Enclosure, busbar and cable interface preparation for installation
- Factory assembly, wiring check and functional interlocking verification
Delivery & Commissioning
Engineering and project teams followed Schneider Electric architecture selection, busbar sizing and interlocking logic. After manufacturing, the cabinets were inspected, packed and shipped according to project logistics. Site support covered positioning guidance, secondary connection review and energization assistance where required by the contract.
Project Value
The completed package helps the end user operate a clearer distribution room layout, reduce interface risk between cabinets and field cables, and keep spare-part / brand consistency for later expansion. Project reference: Schneider Electric Distribution Room Turnkey Set (Asia · MV + LV Set · COD 2025).