Project Scope
This case covers a ABB solution for Asia. The contracted scope centers on 12–24 kV Class, with delivery readiness targeted for 2024. Kodery coordinated primary scheme review, panel manufacturing and on-site interface checks so the lineup could enter service with clear feeder logic and documented settings.
A compact ABB secondary substation package combining withdrawable VCB cubicles and control compartments, prepared for export packing and site commissioning support.
Technical Configuration
The technical package is built around ABB medium- and low-voltage switchgear, protection relays and feeder packages. Typical work items include:
- Primary scheme confirmation for incoming, bus-tie and outgoing sections
- Protection and metering layout aligned with the site single-line diagram
- Enclosure, busbar and cable interface preparation for installation
- Factory assembly, wiring check and functional interlocking verification
Delivery & Commissioning
Engineering and project teams followed ABB frame layouts, protection coordination and factory/site acceptance testing. After manufacturing, the cabinets were inspected, packed and shipped according to project logistics. Site support covered positioning guidance, secondary connection review and energization assistance where required by the contract.
Project Value
The completed package helps the end user operate a clearer distribution room layout, reduce interface risk between cabinets and field cables, and keep spare-part / brand consistency for later expansion. Project reference: ABB Secondary Substation Cubicle Package (Asia · 12–24 kV Class · COD 2024).
