GCK Dual-Power & Withdrawable Feeder Upgrade

Project Overview

Industrial sites in Pakistan and similar markets need dual-power transfer plus fast drawer replacement. Kodery supplied a GCK-type withdrawable LV lineup with a dual-power switching section and modular outlet cabinets. Zhejiang Kodery Electric Co., Ltd. — the foreign-trade arm of Wenzhou Kangda Complete Electric Equipment Co., Ltd. (founded 2005) — designs and supplies medium- and low-voltage switchgear packages for industrial plants, commercial complexes, and utility feeders. Products are exported to markets including Uzbekistan, Indonesia and beyond, backed by ISO9001 quality systems and in-house manufacturing in Wenzhou, Zhejiang. The package suits plants and logistics hubs that cannot afford long feeder outages.

  • RegionPakistan
  • CapacityLV GCK Lineup
  • COD Time2024
Get A Quote

Project Scope

This case covers a Eaton solution for Pakistan. The contracted scope centers on LV GCK Lineup, with delivery readiness targeted for 2024. Kodery coordinated primary scheme review, panel manufacturing and on-site interface checks so the lineup could enter service with clear feeder logic and documented settings.

Industrial sites in Pakistan and similar markets need dual-power transfer plus fast drawer replacement. Kodery supplied a GCK-type withdrawable LV lineup with a dual-power switching section and modular outlet cabinets. Zhejiang Kodery Electric Co., Ltd. — the foreign-trade arm of Wenzhou Kangda Complete Electric Equipment Co., Ltd. (founded 2005) — designs and supplies medium- and low-voltage switchgear packages for industrial plants, commercial complexes, and utility feeders. Products are exported to markets including Uzbekistan, Indonesia and beyond, backed by ISO9001 quality systems and in-house manufacturing in Wenzhou, Zhejiang. The package suits plants and logistics hubs that cannot afford long feeder outages.

Technical Configuration

The technical package is built around Eaton distribution assemblies, breakers and industrial power packages. Typical work items include:

  • Primary scheme confirmation for incoming, bus-tie and outgoing sections
  • Protection and metering layout aligned with the site single-line diagram
  • Enclosure, busbar and cable interface preparation for installation
  • Factory assembly, wiring check and functional interlocking verification

Delivery & Commissioning

Engineering and project teams followed Eaton device matching, feeder grouping and installation readiness. After manufacturing, the cabinets were inspected, packed and shipped according to project logistics. Site support covered positioning guidance, secondary connection review and energization assistance where required by the contract.

Project Value

The completed package helps the end user operate a clearer distribution room layout, reduce interface risk between cabinets and field cables, and keep spare-part / brand consistency for later expansion. Project reference: GCK Dual-Power & Withdrawable Feeder Upgrade (Pakistan · LV GCK Lineup · COD 2024).